Nationwide distributor for hospitality and commercial construction(346) 851-7576
Developers · general contractors · architects · interior designers

Your material list, priced and sourced from one desk.

Send a takeoff, a finish schedule or an FF&E budget. We come back with one consolidated quote across every category, a real lead time against each line, and alternates where the spec comes back over budget.

Request a quote

Send a takeoff, finish schedule or FF&E budget. Or see how we handle value engineering first.

Scope

Where we come in on a project

Phase 01 — shell & core

Building materials

Framing, drywall, insulation, roofing systems, doors and frames, windows, glazing and hardware. Bought by the truckload where the schedule allows it.

Priced off your takeoff
Phase 02 — interiors

Finishes & fixtures

Flooring, tile, millwork, countertops, wall protection, lighting packages, plumbing fixtures and bath. Matched to the finish schedule, submittals included.

Submittal packages · samples on request
Phase 03 — turnover

FF&E and OS&E

Casegoods, seating, mattresses, linens, TVs, kitchen equipment and the opening order of operating supplies — quoted as one package and delivered when the property is ready to receive it.

One PO · one invoice · tracked to delivery
For architects & interior designers

We price the spec as drawn — then tell you honestly what an alternate costs you.

Specifiers get burned by suppliers who quote a substitute at first pass and let the designer discover it on site. We do not do that. Your spec gets a number against the product you named. If it comes back over budget we will go and find alternates and bring you the maker’s own data on how they differ — you decide whether the trade-off is acceptable, because that is your call and not ours.

Specify us and we stay in the background: your client sees your drawings honoured, and you get submittals in the format your reviewer expects.

Submit a spec package
What comes back with every quote
  • Line-item pricing tied to your spec numbers
  • Cut sheets and product data for submittal
  • Lead time per line, with the long poles flagged
  • Manufacturer data on fire rating, ADA and code
  • Freight and delivery terms, not “TBD”
  • Samples shipped on request before you commit
Value engineering

The alternate sits next to the spec, never instead of it

Over budget is normal. Being told about a substitution after it ships is not. Every alternate we put forward comes with the manufacturer’s own specification beside the one you drew — finish, rating, warranty, lead time — so the difference is a decision you make rather than a surprise you discover.

Sometimes the answer is that there is no alternate worth the warranty risk. We will say that too, and hold the spec. And where a question is outside what we can answer — a structural detail, an inspector’s interpretation — we will tell you that plainly instead of guessing.

What we handle, and what we do not

We would rather show you the edge of our scope than find it together on site

Plenty of suppliers agree to everything in the meeting and renegotiate it later. Here is the line, in writing, before you issue a PO.

We do

  • Source and price your list across every category, on one quote
  • Give you a real lead time per line and flag the long poles early
  • Place and track the orders, and tell you the moment a date moves
  • Arrange freight through the maker’s carrier and pass you the tracking
  • Raise and chase damage, shortage and warranty claims
  • Keep a running view of what is committed against your budget

We do not

  • Run our own warehouse or receiving operation
  • Provide installation crews or supervise trades on site
  • Act as your general contractor or construction manager
  • Own the construction programme itself

Where a job needs those, tell us early. We will supply alongside whoever you appoint, or point you at someone who does that part properly.

Paperwork your PM and accounting team will ask for

Anything not listed here, ask us — if we can get it for your project we will say so, and if we cannot we will tell you before you write the PO.

W-9 on fileSubmittal & product data packagesFreight terms priced on every line

Vendor documents — W-9 and references — are sent on request. hello@whitefishcommercial.com

Have a project going out to bid?

Send the documents you already have. We will tell you which lines we are competitive on — and which ones you should keep with your current vendor.

Request a quote